I started on the platen mounting brackets tonight. I still need to mill the slot and drill/tap the platen mounting holes. That shouldn't take too long, and then I can drill/tap the baseplate. The horizontal grinder should come together faster than the kmg, as I have everything I need to complete it. Hopefully I won't let this one take a year to complete.
No comments:
Post a Comment